On technical and ecological matters the local authority generally defers to the environmental regulator, so provided your EA / SEPA / NIEA consents are all in order the planning consent should be forthcoming.


Planning permission will be required for any new structures, though generally this is simpler to obtain than the EA consents because hydropower systems are visually relatively unobtrusive. coffer dams etc.) do not increase flood risk. This includes agreement on how works will be conducted to make sure the riverine environment is protected and also checks that all permanent structures and temporary works (i.e. The process to obtain the licenses is a quite bureaucratic, particularly when dealing with the EA, and takes on average nine months for a typical site.Īs well as a licence to use the water for the operation of the hydro system you will also need permission to do ‘work in the river’ while the system is constructed. All small hydro and micro hydro systems must have hydro licensing issued by the environmental regulator, which is the Environment Agency (EA) in England and Wales, Scottish Environmental Protection Agency (SEPA) in Scotland and the Northern Ireland Environment Agency (NIEA) in Northern Ireland.